Design portfolio

Share Embed


Descripción

6 A103

Department Renova on, University of California, Berkeley Capital Projects

22’ - 9"

11’ - 0"

4

Area: 502 m² The 520 sq. meter project is a small renova on job to accommodate a conference room, a seminar room and six mee ng offices for a University Department for Interna onal Economics and Poli cs. I produced complete schema c and design development documents in Revit and AutoCAD under general supervision from the Firm’s Principal. I was given tracing paper sketches and I created complete design documents for our Contractor to take material take-offs and price the work.

Existing Entry Beyond

Existing Corridor

Reception

3

750 SF 80 SEATS Conference Room

260 SF 80 SF

Huddl

Staff Room

EXISTING KITCHEN

Project Room

250 SF

225 SF

22’ - 9"

80 SF

UP Seminar Room

Huddle

175 SF

490 SF

Stor.

2 IISS Room

162 SF

185 SF

Director

Asst. Director

130 SF

125 SF

22’ - 9"

Storage

11’ - 0"

5

1 22’ - 0"

F

22’ - 0"

G

22’ - 0"

H

I

Main

Schema c Plans (September 2012) made in Revit and Illustrator.

Barrow Hall Remodel, University of California Berkeley - Economics Schema c Design (September 2012) Drawings and renderings made in Revit Architecture 2013

Sec on Perspec ve (September 2012) Schema c Design Reproduced with Ratcliff Architects permission from Principal Bill Blessing Architectural Selected Projects 2004 - 2013

[email protected]

Axonometr

Freelance Rendering and residenƟal Design 11th Street, Sunset District, San Francisco Area: 420 m ² I was employed to produce 3D renderings for a builder working on a design build project in San Francisco. The renderings and isometrics were required for a planning applicaƟon, to allow the project to go forward. I made the geometry in Revit and renderings in 3DS Max.

Exploded isometric showing the interior layout

Interior PerspecƟves (March 2013) made in Revit and 3DS Max

Freelance rendering work Architectural Selected Projects 2004 - 2013

[email protected]

De Anza Secondary School Area: 6,500 m ² I worked on the De Anza School during construc on administra on. The project is en rely naturally ven lated and generates the opera onal power from 6000sf of PV roof mounted panels. The drawings were created in Revit and Adobe Illustrator. During periodic site visits the external louvres were checked to prevent overhea ng. During construc on the general contractor sent RFIs through a web server, to eliminate paper and make it easier to find a client’s approval for construc on decisions.

Reproduced with Ratcliff Architects permission from Principal Bill Blessing Architectural Selected Projects 2004 - 2013

[email protected]

Foothill College Science Laboratories Revit Construc on Documents : Area: 4300 m²

KEY PLAN

Reproduced with Ratcliff Architects permission from Principal Bill Blessing Architectural Selected Projects 2004 - 2013

[email protected]

SeaƩle Masterplan for Mount Baker Transit StaƟon “HONERABLE MENTION” FROM URBAN LAND INSTITUTE 2012 Area: 135,575 m ² This Urban Design Graduate compeƟƟon in SeaƩle-USA connects downtown SeaƩle and the internaƟonal airport, to create a walkable neighborhood. In our interdisciplinary team of four post-graduate students (Architecture, Landscape, Urban Design and Business) we proposed a live-work neighborhood, centered around the metro train, a cycle network and a pedestrian thoroughfare. The 14 day compeƟƟon was very fast, and culminated in our design and pro-forma being shortlisted from 160 entries worldwide.

K ML

ER

Y WA JR

INI RA E AV S

seattle connections

MLK PARK

)

ns

mi (7 e

24

tl

90

at

Se

7 8

Y

wn

11 25

rt Po

HW

o nt

w

Do

10

6

5

12

3

A

A`

14

27

13

17

15

4

18 16

) ns s) mi min (3 21 ty t ( i C or ia rp mb Ai u l c Co aTa Se

The mt.baker train station is placed in an extraordinary midpoint between downtown seattle and seatac airport. This design provides prov the urban strategy for creating crea walkable development surrounding surroun the station. The multi-nodal network that will emerge surrounding the central link light rail will create a corridor of pedestrian friendly neighborhoods.

S. MCCLELLAN ST 23

19 9 20 1 21 FRANKLIN HIGH SCHOOL

26 28 22

2 CHEASTY BLVD. GREENWAY

LIVE

OLMSTED GREENWAY

N

WORK

1 2 3 4

Artspace Olmsted Senior Living Hillside Family Housing Greenway Studios

8 9 10

5 6 7

Community Center Elementary and Middle school High School Academies

11

SHOP Amazon.com US Bank “Green Way” Research Institute U-Haul Trucking & Storage

0

180

ENJOY

12 13 14 15 16

Starbucks Noah’s Bagels Trattoria Lena’s Cafe Garlic Gulch

19 20 21 22 23

Post Office Dry Cleaning Laundromat RiteAid/QFC McClellan Market

17 18

AMC Theaters Target

24 25

W. Baker, DDS Sick McClellan, MD

Station

stormwater management central greenway recreation dining retail neighborhood service transit connection

landscape system: streets

overflow bypass

vegetated swale

green roof catchment

storage tank

landscape system: center green

Architectural Selected Projects 2004 - 2013

[email protected]

Museum of Archaeology, Porto- Portugal Building Area 4100 m ² 41,000 s.f. RaƟo of Site to Building footprint 1.9 : 1 The design project contains an urban masterplan for Porto City and then a public building design within the masterplan. Porto has a spectacular city fabric, with a rich cultural history. The Archaeology Museum is located in Porto, Portugal and contains a rare collecƟon of Roman ruins, Neolithic statues and medieval arƟfacts. The horse-shoe plan wraps round the ancient ruins uncovered below the street in a purpose built unheated exhibiƟon.

Architectural Selected Projects 2004 - 2013

[email protected]

Salt, FormaƟon and Emergence at the Dead Sea UC BERKELEY AWARD FOR DIGITAL DESIGN EXCELLENCE 2012 Each year the Dead Sea is disappearing at 3 feet, due to high temperatures and strong prevailing wind. I propose to use the changing Salt landscape to create an architectural form which uses the Salt from the drying Sea water to build a monument to the Dead Sea for future visitors to see how the Sea once looked. The Monument will be formed from a crystalline armature which the salt will cluster on as the Sea disappears.

These models are enƟrely made from Salt in a 3D-printer, using a technique I developed for the first Ɵme at UC Berkeley.

AŌer the Dead Sea evaporates in 105 years, the building is made from the salt crystalisaƟon. The Dead Sea will deposit salt on 3D-printed Salt spaces. [models at 1/16”=1’ Scale in Salt]

Above: Diagrams showing the process of slow salt crystalisaƟon

The Thesis creates a monument to the Dead Sea in this rendering in 2117

Stop-moƟon photography showing how to take out a finely-grinded Salt 3D Print model Architectural Selected Projects 2004 - 2013

[email protected]

Affordable Housing : Glasgow, Scotland Area: 6,500 m ² A masterplan in a low-income area, creates 205 housing units with shared courtyard. Shared stairwells and integrated live-work apartmentunits, generate community and employment. The housing density is 125 units per hectare. The apartments come in one, two and three bedroom types to accommodate a mixed group of residents.

KEY PLAN FOR LONG SECTION

SITE INFRASTRUCTURE

Road Level Lower Site Level

BLOCKS North Block South Block New Ground Level Services

Lower Site Level

K l i g Kelvingrove

GREEN SPACE North Block South Block

Riverside green route

New Ground Level Services

Lower Site Level

Pe eab Permeable ble Bll k Blocks

LEVELS -CONNECTIONS North Block

Riverside

New Ground Level Lower Site Level

HOUSING BOOKEND Benalder B Bri Bridge

PEDESTRIAN BRIDGE Pedestrian Bridge

Architectural Selected Projects 2004 - 2013

[email protected]

Built Project: Indian Himalayas Noel Hill Travel Award 2010 - American InsƟtute of Architects: UK 1st Prize in the NaƟonal AIA (UK) Excellence in Design Awards 2010 I used a first prize award for the AIA for my work, to travel here to help build this museum and provide working drawings. I was part of a team building a small community museum in the Indian Himalayas in Leh Village with Habitat for Humanity. Poplar wood and adobe bricks were used through this construcƟon. I lived there for a summer, visiƟng the site and working with the Project Manager and Engineer to keep providing the construcƟon drawings. As well as drawing I spent many weeks onsite, learning carpentry and wood joinery, on your right you can see me making a museum window frame for installaƟon. [I produced all the drawings seen on this page in three months]

Architectural Selected Projects 2004 - 2013

[email protected]

Lihat lebih banyak...

Comentarios

Copyright © 2017 DATOSPDF Inc.